Project · Corporate film · Fanling, Hong Kong

Layers of confidence, on the Fanling Bypass.

Saint-Gobain
Watch the full film

Monumental material science, filmed layer by layer on the deck of Hong Kong's Fanling Bypass.

01/ 07

Saint-Gobain. Building materials for Hong Kong, from the ground up to the bridge deck.

Watch the film

The film

Fanling Bypass — proof on the bridge.

Produced for Saint-Gobain
Corporate film · Fanling, Hong Kong · 2:55

Client // Profile

Saint-Gobainclient, building materials for Hong Kong's newest highwayFanling Bypass. Filmed from the air, up close and on the deck.

Production spec

Client
Saint-Gobain
Project
Fanling Bypass
Location
Fanling, Hong Kong
Film
Documentary case study
Filming
Aerial · macro · interviews
Post
Grade · 3D graphics · sound
Cutdowns
Five social films
Delivered
2026 · 2:55

The story

Real people. Real process. Reliable protection.

A concise documentary case study, filmed where the work happens. We followed a spray-applied bridge deck waterproofing system on the Fanling Bypass from bare concrete to asphalt, and kept the camera honest: drone for scale, macros for detail, and calm interview frames on the deck.

The Fanling Bypass is the first major transport artery completed for Hong Kong's Northern Metropolis. Material science is invisible once the asphalt is down, so the film makes it visible: restrained graphics explain what is happening and why it matters, and the footage and the voices carry the rest.

The deliverables

Five films

The social cutdowns. Five short cuts of the 2:55 film above.

From above, the bypass curving through the valley, then down to the deck.

Now showing Scale, social cutdown, 0:19

Web element · Spotlight Wall

Silent loops · the full film is above

From the air

Scale first, then the work front.

Our drone work orients the viewer in seconds. Wide passes set the viaduct in its landscape, tracing its curves through the valley, over the river and across the railway; then controlled, low-altitude tracks follow the crews along the span. Aerial cinematography gives a four-kilometre highway its true size before the film comes down to the deck.

Production Delivered

Corporate film · Fanling, Hong Kong

Saint-Gobain

A documentary case study filmed on the deck of the Fanling Bypass, from bare concrete to asphalt.

Client

Saint-Gobain

Project

Fanling Bypass

Core film

2:55

Cutdowns

Five social films

Filming

Aerial · macro · interviews

Post

Grade · graphics · sound

Visual Suspect HONG KONG

On the deck

Up close, coat by coat.

On the deck we stay intimate and honest: macro shots of the primer, the colour-coded membrane passes, the bond coat and the asphalt, filmed in the order they go down and explained by the people applying them. The edit plays fast against slow: quick, energetic cuts for the process, steadier pacing for the interviews, so the voices carry weight.

In post

Layer by layer, made visible.

A semi-transparent layer stack locks onto the deck, its labels arriving as the work goes on, with a few clean data callouts and titles revealed word by word. The grade balances steel and concrete against the green of the Northern Metropolis, and a sound design built from real site recordings carries the viewer onto the bridge. One core film, cut down into five social films.

Not a spot, but evidence on the deck.

Get in touch.

Tell us about your project —
we’d love to hear what you wish to make.

Connect

Hong Kong · Worldwide

Studio

B1, 12/F, Cheung Lung Industrial Building,
10 Cheung Yee Street,
Cheung Sha Wan, Kowloon

Drop us a line